KB4 Swedish manufactured emergency bridging. Aluminium construction.
High quality. Approx. 4 hrs per bridge erection time.
Does not require any crane facilities.
These bridges are counter balanced upon erection with only manpower to assemble.
The bridge has the following capacities:50,000kg's @ 15metres and 25,000kg's @ 26 metres
Ex reserve stock. Un-issued.
The photo showing gaps is to illustrate the sectional construction of the bridge.